CLIENT Allied Disciplines    STATUS Complete

Back to projects

 

 

Trolley Transfer Unit

Allied Disciplines

       LAVERTON, VICTORIA

 

 

 

Allied Disciplines appointed HAGE Hydraulics to develop a solution for the mechanical and hydraulic drive system for two trolley transfer units at an undisclosed customer site.    The works included the supply and modification of standard forklift masts.  It also involved the supply of a high performance power unit and control systems with category 4 safety lockout valves.  Works further included the commissioning of the hydraulic system, hoses and pipes.  To ensure minimal impact on operations, the project was costed on concept and delivered with minimal time allowances.